High-level expert team of GSI visits Andaman during 7-12 January, 2005

Previous Previous







an_25 Location:
Naya Gaon, Port Blair
 
 
Description: Shearing of load bearing base columns leading to the caving in of G+2 storied RCC structure

Use the scrollbar at the bottom of this window to view all thumbnails in this section.